Point of Attachment Upgrade Hills District
Getting the service line attached properly on two-storey, rendered and extended homes.
The point of attachment is where the overhead service line meets your house. On single-storey Hills homes it’s usually a galvanised raiser above a tiled roof; on the many two-storey homes it’s a bracket high on a brick or rendered wall. It carries the line’s full tension and decides how close the line comes to your roof, windows, balconies and driveway.
Why it needs work
Second storeys and extensions. Adding a level or a large extension often buries the bracket, or puts it next to new windows or a balcony.
Renders and repaints. Rendering brick homes is popular across Baulkham Hills, Castle Hill and Winston Hills. Renderers need the supply isolated, and the bracket’s fixings need checking before the new finish goes on.
Re-roofs. Tiles out, metal in: the raiser comes out and goes back, and is often replaced.
Balconies, decks and alfrescos. The rules set clearances from areas people stand on. New balconies and decks can bring the line too close.
Driveways and caravans. Sloping driveways, carports and caravans can reduce clearance over the driveway.
Storms. Branches and wind pull fittings loose.
If a fitting has pulled away or the line is hanging low, keep clear and call our emergency level 2 electrician team.
Brackets and raisers
On two-storey homes, a bracket fixed into sound brickwork or structure is usually the answer. On single-storey homes with tiled roofs, a raiser fixed to the roof framing lifts the attachment above the roofline. We choose the spot that gives the line a clean, compliant run from the pole and keeps it away from windows and balconies.
Do it with the mains
Moving the attachment usually means extending or replacing the mains to the meter board. If they’re original, a consumer mains upgrade on the same day avoids a second outage. For renovations, we handle the power disconnection and reconnection and reconnect to the new bracket when the builders are done.
Or go underground
On a big renovation, compare the cost of moving the attachment with going underground. On many Hills homes the difference is smaller than owners expect.
On the day
We notify the network, disconnect, fit the new bracket or raiser, extend the mains and transfer the line, then reconnect, test and certify. Most jobs take half a day.
Clearances in plain terms
The rules set minimum heights for the service line over footpaths, driveways and roofs, and distances from windows, balconies and decks. They exist because a low or close line can be hit by a vehicle or reached from a balcony or ladder. On sloping Hills blocks, where the street is above or below the house, getting those heights right takes careful placement of the new bracket.
Signs it needs attention
A bracket pulling away from the wall, cracked render around its fixings, a line that’s dropped lower than it used to, or rust on an older raiser are all reasons to call. Fixing it on a calm day costs far less than an emergency after a storm.
Planning an extension
If an extension, balcony or alfresco is in the plans, bring us in at design stage. Moving the attachment before construction avoids a clearance problem afterwards.
Raisers on single-storey homes
Single-storey brick homes across Northmead, Winston Hills and Baulkham Hills usually have a raiser through the tiled roof. Re-roofs, hail and decades of sun take their toll, and a raiser that leans or rusts at the base should be replaced before it fails, ideally while the roofers are already on site.
Get a price
Call your level 2 electrician Hills District team for a site visit. We move a lot of brackets for second storeys in level 2 electrician Northmead and Winston Hills.
Updated
What good point of attachment upgrade looks like
Point of Attachment Upgrade in the Hills District: step by step
- Check fixings and clearanceWe look at the bracket's fixings, its condition and the line's height over the driveway, roof and balconies.
- Choose the new spotA compliant position with a clean run from the pole and a solid fixing.
- InstallNew bracket or raiser fitted, mains extended, line transferred.
- ReconnectReconnected, tested and certified.
Point of Attachment Upgrade across the Hills District
Point of Attachment Upgrade questions in the Hills District
Something else on your mind? Call 02 9158 9966 and ask.
We're rendering the house. What happens to the bracket?
The supply is disconnected so the renderers can work safely, and the bracket is checked and refixed or replaced before reconnection.
Our new balcony is close to the service line. Is that a problem?
It may be. The rules set clearances from balconies and areas people stand on. We'll measure and move the attachment if needed.
How high up can you work?
Two-storey walls are routine. We use the right access equipment for the site.