Skip to content
Knockdown rebuild in Baulkham Hills disconnected from the network
Level 2 electrical

Power Disconnection and Reconnection Hills District

The supply isolated safely for demolition crews, renderers, roofers and builders, and restored when they're done.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

The main switch turns off your circuits, but the line, the bracket and the mains up to the meter board stay live. Anyone working near them, or knocking the house down, needs the supply isolated at the network side. In the Hills District, with constant knockdown rebuilds, renders and extensions, power disconnection and reconnection is one of our most common jobs.

Knockdown rebuilds

Baulkham Hills, Castle Hill, Winston Hills, Northmead and Cherrybrook are full of 1970s and 80s homes being replaced with large new houses. Before demolition, the supply is permanently disconnected and the service removed. We book it ahead of the demolition date and usually set up a temporary builders supply on the same visit.

Renders and repaints

Rendering brick homes is everywhere in the Hills. Renderers on scaffold near the bracket need the supply isolated. Before reconnection, we check the bracket’s fixings, because renders often go over them, and replace it if needed with a point of attachment upgrade.

Re-roofs and extensions

Re-roofs, second storeys and big rear extensions all change where the line and meter board need to be. We disconnect for the builders and reconnect to the new attachment and board at the end.

Switchboard upgrades

When your electrician upgrades the switchboard or main switch, the supply has to be isolated. We coordinate so it’s done in one day.

Acreage

On acreage, the house, pool house, sheds and granny flat may be on separate private lines. Sometimes only part of the property needs isolating. We check the arrangement before booking.

Temporary or permanent

A temporary isolation ends with us reconnecting, testing and certifying. A permanent one, for demolition, ends with the service taken away and the network side left safe.

Timing and paperwork

A planned disconnection usually takes less than an hour. The lead time is lodging with the network and fitting around your trades, so a few days’ notice helps. We give builders written confirmation of the isolation for their safety plan, and can provide a notice for tenants.

On the reconnection day

Before reconnecting, we check the bracket, mains and clearances after the work. If anything has changed, we explain it and price the fix before going further.

What happens on disconnection day

We arrive at the agreed time and confirm with whoever is on site what they’ll be doing and for how long. We check how the house is supplied, isolate at the right point, and make the line or cable safe so it can’t be re-energised by mistake. The trades get a clear go-ahead in person. For a knockdown, the service is removed entirely and the network side left safe for the excavator.

Two-storey and rendered homes

Many Hills homes are two storeys with the bracket high on a rendered wall. Renderers and painters on scaffold work right next to it, so isolation matters even for a quick repaint. Before we reconnect, we check the bracket’s fixings under the new render; if they’ve been compromised, we refix or replace it so the line is held securely for years.

Pools and landscaping crews

Pool excavations and landscaping can come close to underground consumer mains that nobody has located. If your supply is underground and a dig is planned, we can find where the cable runs and isolate it if the crew needs to work close by.

Book it

Ring the level 2 electrician Hills District team with your dates. If something is unsafe right now, use the emergency level 2 electrician number instead; it’s answered day and night.

Updated

What it costs comes down to how the house is supplied (pole, pit or private line), how many phases, whether the job is temporary or a demolition, and how many trips we make. You'll have the figure before we book.

What good power disconnection and reconnection looks like

Close-up of power disconnection and reconnection on a home in the Hills District area
What power disconnection and reconnection looks like up close on a typical Hills District area home.
Signs that power disconnection and reconnection needs attention
Typical signs that it needs attention.

Power Disconnection and Reconnection in the Hills District: step by step

  1. Lock in the datesWe book around your demolition crew, renderer, roofer or builder.
  2. Notify the networkEndeavour Energy or Ausgrid, depending on your street.
  3. Isolate safelyDisconnected at the pole, pit, private pole or bracket and made safe.
  4. Reconnect or removeReconnected and certified, or removed for demolition.

Power Disconnection and Reconnection questions in the Hills District

Something else on your mind? Call 02 9158 9966 and ask.

Our builder needs the house disconnected before demolition next week. Is that enough time?

Usually, if we can lodge the notification straight away. Call as soon as you have the date.

Do renderers need the power off?

If they're working on scaffold near the bracket or line, yes. The line stays live with the main switch off.

Can you set up site power the same day?

Yes. Demolition disconnection and the site pole are normally one trip, so the builder never loses power.

Need a Level 2 electrician in the Hills?

📞 Call now Free quote