Skip to content
Temporary site power at a Box Hill build
Level 2 electrical

Temporary Builders Supply Hills District

Metered, protected power for your builder from day one, from a pole, a pit or the acreage frontage.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

Every Hills build needs safe site power from day one: knockdown rebuilds in Baulkham Hills and Castle Hill, new homes on fresh lots in Box Hill, Rouse Hill and North Kellyville, and big new homes on acreage in Dural and Kenthurst. A temporary builders supply gives the trades a metered connection to the network, with safety switches and weatherproof outlets.

Three kinds of Hills site

Established streets. Overhead mains on poles. A temporary pole near the frontage takes an overhead service from the street.

New estates. Box Hill, Rouse Hill and North Kellyville streets are underground, so the site board plugs into the pit at your boundary.

Acreage. The connection point may be at the road frontage, far from the build. We set up the supply there and plan how power reaches the building area.

On sloping blocks, we place the supply on the most level practical spot near the street, clear of where machinery will work.

The right order

  1. Permanent disconnection of the old house
  2. Site supply installed the same visit
  3. Build on site power
  4. Permanent supply connected to the new meter board
  5. Site supply removed

Our power disconnection and reconnection page covers step 1. Large Hills homes are often three phase, so lodge the three phase power application early.

What we need

Send us the address, your builder’s details, a site plan, whether you need single or three phase, the start date, and confirmation that a retailer account is open for the site.

Safety on site

Site supplies get knocked by machinery and splashed with concrete. We install them to cope. If an overhead line runs near the work area, we advise on keeping cranes, pumps and scaffold clear, and can arrange isolation during critical work.

Common hold-ups

No retailer account, the pole where the driveway goes, the wrong number of phases, or demolition booked before disconnection. We go through each at the start.

Moving it

When the driveway or landscaping starts, the site supply may need to move. We relocate it with a short disconnection.

Project builders

Volume builders working several lots across Box Hill and Rouse Hill can book site power and final connections as one program.

At handover

We connect the permanent supply, test and certify, and remove the temporary supply.

Heat and storms on site

Hills summers are hot, and storms build quickly over the ridges. Site boards are weatherproof, but if one is damaged or water gets in, the trades should stop using it and call us. We’ll make it safe and restore power as quickly as we can.

Rebuilds with a granny flat

Rebuilds that include a granny flat or second dwelling usually run both builds on one site supply, with the permanent supplies planned together at the start. We work out the load and the meter arrangement with your builder before the slab goes down.

Granny flat builds on established blocks

Where a granny flat is being built behind an existing home, a small build can sometimes run from the house supply. For anything substantial, a separate temporary supply is safer and keeps the house’s circuits free for the family living there.

Written confirmation

Builders often need written proof that the old supply was isolated before demolition. We provide it, along with the certificate for the permanent connection at handover.

Book site power

Builders across level 2 electrician Rouse Hill, Box Hill and Baulkham Hills use us. Call the level 2 electrician Hills District team.

Updated

Site supply is priced on the pole or board type, single or three phase, the connection point, slope and access, and how it's removed or converted at the end. We confirm on site.

What good temporary builders supply looks like

Close-up of temporary builders supply on a home in the Hills District area
What temporary builders supply looks like up close on a typical Hills District area home.
Signs that temporary builders supply needs attention
Typical signs that it needs attention.

Temporary Builders Supply in the Hills District: step by step

  1. Position itWe place the supply where excavators, concrete pumps and scaffold won't hit it, on sloping sites too.
  2. Lodge and arrangeWe notify the network and tell you exactly what to request from your retailer.
  3. InstallTemporary pole or site board installed, connected and tested.
  4. Hand overNew home connected when the board is ready; site supply removed.

Temporary Builders Supply questions in the Hills District

Something else on your mind? Call 02 9158 9966 and ask.

Our block slopes away from the street. Where does the site supply go?

Usually near the frontage on the most level practical spot, with a sub-board or leads to the build. We plan it with your builder.

We're building in a new Box Hill estate. Is it different?

New estates have underground mains, so the site board connects to the boundary pit.

Can site power be three phase?

Yes, if three phase is available. Many large Hills builds use it.

Need a Level 2 electrician in the Hills?

📞 Call now Free quote