A pool and an EV are now standard on a lot of Hills District wish lists. Add them to a home that already runs ducted air on two levels, a big kitchen and a home office, and the power supply can quickly become the limit. This guide explains how those loads add up, how to tell if your supply can cope, and what the upgrade options are.
How the loads add up
Your home’s supply has a maximum it can safely carry, set by the size of the network connection, the consumer mains and the main switch and service fuse. Every big appliance takes a share.
Pools and spas. The filter pump runs for hours every day. A heat pump to warm the pool runs for long periods, often in the evening. A spa heater draws a lot when in use. Chlorinators, cleaners and lighting add a little more.
EV chargers. A home charger draws a steady, significant load for hours, usually overnight. Two cars, or a fast charger, multiply that.
Ducted air. On a hot evening, large two-level systems are among the biggest loads in the house.
Kitchens and laundries. Induction cooktops, double ovens, dryers and dishwashers all peak around dinner time.
The problem isn’t any single appliance. It’s everything running at once on a summer evening, when the pool heater, ducted air, oven and car charger overlap.
Signs your supply is near its limit
- The main switch or service fuse trips on hot evenings
- Lights dim when the ducted air or pool heater starts
- The meter box is warm or smells hot
- Your installer has told you the supply is too small
- The EV charger is set to a low rate to avoid tripping
Step 1: get a load calculation
Before buying equipment, ask your electrician to calculate your maximum demand: what the house will draw at its busiest with the new pool and charger included. That number decides what you need.
Step 2: choose the fix
Smart or load-managed charging
Some EV chargers can measure the house’s load and slow down when other appliances are busy. In homes close to the limit, this can avoid an upgrade, at the cost of slower charging at peak times.
Upgrade the consumer mains
If the network connection is adequate but the mains are small or old, a consumer mains upgrade replaces them with larger cable. Common on 1970s to 1990s Hills homes.
Move to three phase
If the calculation shows a big shortfall, or you want two fast chargers plus a heated pool and two-level ducted air, a three phase power upgrade is usually the right foundation. It needs an application to the network, new three phase mains, a three phase meter and switchboard work.
Step 3: think about timing
Upgrade before the equipment arrives. It’s cheaper and simpler than retrofitting after the pool is filled and the charger is on the wall.
Combine with other work. If the pool excavation or landscaping is happening anyway, consider an overhead to underground conversion at the same time, laying the bigger cable in the same trench.
Lodge early. Network applications for three phase take time.
Network matters
Most of the Hills is on the Endeavour Energy network; Cherrybrook and parts of West Pennant Hills are on Ausgrid. The upgrade process is similar, and we lodge with whichever network supplies your street.
Solar and batteries
If you have or are adding solar and a battery, include them in the load calculation. They can offset some of the load during the day, but EV charging overnight and pool heating in the evening often fall outside solar hours. Larger systems may also need three phase.
A quick checklist
- List every big load you have and plan to add
- Get a maximum demand calculation
- Decide on smart charging, mains upgrade or three phase
- Time it before the pool and charger are installed
- Trench once if undergrounding
- Lodge network applications early
Running costs
A bigger supply doesn’t increase what you use; your appliances use what they use. Timing helps, though: running the pool heater and charging the car in the cheapest tariff periods, or from solar during the day, reduces bills more than any supply change.
Pool equipment placement
Where the pool equipment sits affects the cable run from the switchboard and sometimes where the meter board should be. Plan it with your pool builder and electrician before the excavation.
Talk to us
Call the Hills District level 2 electrician team for advice on your supply. If you’re also rebuilding, our guide to knockdown rebuild power connection covers the steps from demolition to handover.
Updated
Pool and EV charger power upgrade: common questions
Something else on your mind? Call 02 9158 9966 and ask.
Can I just install a slower EV charger instead?
Yes. A lower-rated charger, or one that adjusts to the house's load, can avoid an upgrade in some homes. It trades charging speed for supply capacity.
Does a pool really use that much power?
The pump alone is moderate, but a heat pump or electric heater running for hours, plus a spa, adds up quickly, especially alongside ducted air.
Who should check our supply?
Your electrician can calculate the load. If the supply needs upgrading, that part is Level 2 work and needs a network application.